IPTL was incorporated to implement an Inter-State Transmission System (ISTS) project awarded through tariff-based competitive bidding. The Letter of Intent was issued by REC Power Development and Consultancy Limited (RECPDCL) to the IndiGrid in January 2024, for a 35-year period from the scheduled commercial operation date, under the Build, Own, Operate and Transfer (BOOT) model. The Transmission Service Agreement (TSA) for the project was signed with the Long-Term Transmission Customers on February 9, 2024, post which the project SPV was acquired by the IndiGrid Consortium. The project is currently under construction and is expected to be commissioned in FY2025–26.

Ishanagar Power Transmission Limited in the Grid

The project consists of the construction of substations and a transmission line in Madhya Pradesh. Once built, the project will help cater to the electricity demand of the proposed green hydrogen plant in the nearby area and for the interconnection of a 630 MW Solar Plant.

Details of IPTL’s project elements are as follows:

Project element ROUTE LENGTH (CKMS) Substation capacity (MVA) SPECIFICATIONS COMMISSION DATE EXPIRY TERM OF TSA
Ishanagar LILO 33 - 765kV DC Under-Construction 35 years from COD
Ishanagar S/S - 2x1500 MVA, 765/400 kV and 2x500 MVA, 400/220 kV - Under-Construction 35 years from COD